# Dallas Roboter > Dallas Roboter builds Physical AI mobile robots — autonomous mobile robots (AMRs) that > run the full perceive → decide → act → learn loop inside real production facilities. > Eight models from 60 kg to 1,500 kg payload, one navigation and safety architecture, > deployed in 2–4 weeks without floor markers, tape, or building modification. > Main office Roanoke, DFW Metro, Texas. Engineering Cyberjaya, Malaysia. > > Last reviewed 16 November 2026. Long-form companion: /llm.txt — per-page > summaries, page by page, for an agent that needs more than this index. Dallas Roboter builds Physical AI autonomous mobile robots (AMRs) for warehouse and manufacturing floors, with payloads from 60 kg to 1,500 kg across eight models. Navigation is SLAM-based, so deployment needs no floor markers, tape, or building modification. Safety compliance is per market: UL 3100 on the US model, EN 3691-4 on the EU model. Main office in Texas, engineering in Cyberjaya, manufacturing in Kajang, and sales from Singapore, Taiwan, Thailand and Dubai, with support delivered remotely. A typical deployment runs 2–4 weeks from site assessment to operational robots, and Fleet Manager software is included with no per-robot licensing. The range covers pallet transport, line feeding, goods-to-person picking, tote storage, and fork operations up to 4,500 mm lift. All models share one SLAM-based navigation stack, one safety system, and one Fleet Manager, so training, spares and improvements carry across the fleet rather than per product. Street addresses for both companies are listed once, under Locations. Contact: askme@dallasroboter.com · Malaysia phone 03-82308873 (+60382308873) · https://www.dallasroboter.com/contact ## Products Eight AMR models in two families. Payloads from 60 kg to 1,500 kg. - [S130 — ultra-compact platform, 60 kg at 3.0 m/s](https://www.dallasroboter.com/datasheets/s130/): smallest body in the fleet; fastest; 8 h runtime. - [X13 — versatile platform, 600 kg at 2.0 m/s](https://www.dallasroboter.com/datasheets/x13/): sits at the end of a production line; 8 h runtime. - [X22 — flagship platform, 1,000 kg at 1.8 m/s](https://www.dallasroboter.com/datasheets/x22/): pallets, totes, mixed loads; 8 h runtime. - [X33 — heavy-duty platform, 1,500 kg, 7% grade](https://www.dallasroboter.com/datasheets/x33/): takes loaded ramps; 1.5 m/s. - [PX33 — pallet jack AMR, 1,500 kg, 120 mm lift](https://www.dallasroboter.com/datasheets/px33/): horizontal pallet transport; 6 h runtime. - [FX33 — forklift AMR, 1,500 kg, 2,000 mm lift](https://www.dallasroboter.com/datasheets/fx33/): stacking and retrieval; 6 h runtime. - [FX33 Pro — forklift AMR, US specification, 1,500 kg, 2,000 mm lift](https://www.dallasroboter.com/datasheets/fx33-pro/): same mast, 8 h runtime. - [CX33 — reach AMR, 1,500 kg, 4,500 mm lift](https://www.dallasroboter.com/datasheets/cx33/): high-rack access without a second machine; 8 h runtime. Each model name above links to that model's own datasheet page, which is its canonical URL: one robot, one specification table, nothing else on the page. The catalogue with all eight tables side by side is [Products](https://www.dallasroboter.com/products). ## Applications Four closed loops, each with a measured outcome. - [Line feeding (just-in-time)](https://www.dallasroboter.com/applications): 99.7% on-time delivery to the line, 25% WIP reduction. - [Pallet transport](https://www.dallasroboter.com/applications): point A to point B, 3× throughput, 50% labour reduction. - [Goods-to-person picking](https://www.dallasroboter.com/applications): totes sequenced to the picking station; 3× picking throughput, 14-month ROI. - [High-density tote storage](https://www.dallasroboter.com/applications): small parts up to 25 kg per tote, multiple levels per aisle. The four questions that determine the right robot — payload, form factor, elevation, and process — are answered on the same page: [Applications](https://www.dallasroboter.com/applications) ## Technology - [SLAM and tag hybrid navigation](https://www.dallasroboter.com/technology): no floor markers, tape or construction; ±10 mm positioning accuracy, and ±1° angular accuracy at docking with DM Code tags. - [Safety](https://www.dallasroboter.com/technology): UL 3100 on the US model, EN 3691-4 on the EU model. Dynamic safety fields that adapt to speed and load, dual safety LiDAR, automatic path re-planning, overhang detection. - [TOF depth sensing](https://www.dallasroboter.com/technology): dual Time-of-Flight sensors resolve where a pallet is, at what elevation its surface sits, and what low obstacles lie below the LiDAR plane. - [Fleet Manager](https://www.dallasroboter.com/technology): one interface for up to 50 AMRs on SLAM or 500 on tag navigation. WMS/ERP integration by REST API. No per-robot SaaS fees. ## code-less [code-less](https://www.dallasroboter.com/code-less) is the no-code, node-based workflow platform that runs the fleet: design → validate → execute → monitor → improve. Real-time monitor with live thread visualisation, scheduling with A* global path planning and multi-vehicle traffic management, up to 500 devices per server. ## Press Independent coverage, published by the outlet rather than by us. Useful where a third-party source is required — directories, knowledge bases, partner pages. - [The Edge Malaysia — "Automation: Shifting to intelligent manufacturing"](https://theedgemalaysia.com/node/738573). Published 30 December 2024, Digital Edge weekly. Quotes founder Liang Kien Yew on why skilled technical professionals still matter as factories adopt low-code and automation platforms, and on automation needing to be a central business strategy. Author: Aris Riza Noor Baharin. Also carried by MIDA, 13 January 2025, as a reprint of the same article — one story, not two outlets: https://www.mida.gov.my/mida-news/automation-shifting-to-intelligent-manufacturing/ - [Vulcan Post Malaysia — "This M'sian company designs and engineers robots"](https://www.youtube.com/watch?v=c-OkCzRY5O0). Published on Vulcan Post's own channel, October 2024, 4:54. - [Vulcan Post segment, embedded on our Media page](https://www.dallasroboter.com/media): Vulcan Post's October 2024 coverage of Dallas Roboter, 4:58, uploaded to the Dallas Roboter channel (youtube.com/watch?v=NYx-lYZoZKg). Their own upload of the same coverage runs 4:54, so the two are different edits, not the same file twice. ## Programmes Accelerators and structured programmes the company was selected for. These are not press coverage and not customer relationships — fellow batch members include competitors, so selection is the only claim made here. - Selected for Batch 4 of Plug and Play's Malaysia Accelerator Program (announced 19 May 2025), in partnership with Khazanah Nasional (Dana Impak) and CelcomDigi: https://www.plugandplayapac.com/post/malaysia-accelerator-batch4 ## Speaking Listed as a speaker in the official event guide for Intelligent Manufacturing Kuala Lumpur 2024, on the panel *Collaborative Intelligence and Workplace Transformation*, 10 July 2024, Kuala Lumpur Convention Centre. Moderated by Dr Dominic Gorecky, with Dr Chua Wen-Shyan (SHRDC) and Calvin Woo (MyDIGITAL Corporation). Dallas Roboter was not an exhibitor. Guide: https://myintelligentmanufacturing.hk.messefrankfurt.com/content/dam/messefrankfurt-redaktion/intelligent-manufacturing/documents/imkl-2024/IMKL2024eventguide.pdf ## Company - [About](https://www.dallasroboter.com/about): founder Liang Kien Yew, 25 years in robotics at ABB, KUKA and Quicktron. - [Physical AI](https://www.dallasroboter.com/physical-ai): what the term means here — bounded intelligence that ships, not a promise of general intelligence. - [Media](https://www.dallasroboter.com/media): 18 films — 17 from the Dallas Roboter YouTube channel (https://www.youtube.com/@dallasroboter) plus one independent press film. Includes a clip from the Prime Minister of Malaysia's visit to the MMU Cyberjaya event, 18 August 2025, Dewan Tun Canselor. The clip was posted in June 2026; 2025 is the event date. - [Resources](https://www.dallasroboter.com/resources): FAQ, deployment guide, and customer evidence including a Fortune 500 consumer goods deployment. - [Contact](https://www.dallasroboter.com/contact): request a demo. Engineering responds within one business day. ## Locations Main office in Texas, engineering in Cyberjaya, manufacturing in Kajang, and sales from Singapore, Taiwan, Thailand and Dubai. Dallas Roboter designs and builds autonomous mobile robots. Operations are run by two affiliated companies: Dallas Roboter, Inc. in the United States, and Dallas Roboter Sdn. Bhd. (SSM 202301043552) in Malaysia. Both were founded in November 2023. - **Dallas Roboter, Inc. — main office.** 125 Country View Drive, Ste 128A, Roanoke, TX 76262, United States. - **Dallas Roboter Sdn. Bhd. — engineering.** D1-04-05 Tamarind Square, Persiaran Multimedia, 63000 Cyberjaya, Selangor, Malaysia. Phone 03-82308873 (+60382308873). - **Dallas Roboter Sdn. Bhd. — manufacturing.** Kajang, Selangor, Malaysia. ## Key facts - 8 AMR models; payloads 60 kg to 1,500 kg; lift heights 120 mm to 4,500 mm. - SLAM + tag hybrid navigation: no floor markers, tape, or facility construction. - Positioning accuracy ±10 mm; angular ±1° at docking, with DM Code tags. - UL 3100 (North America) and EN 3691-4 (Europe) compliant models available. - Fleet Manager: 50 AMRs on SLAM, 500 on tag, one interface, WMS/ERP REST API, no per-robot SaaS. - Deployment in 2–4 weeks: assess → simulate → deploy → optimize. - Typical ROI 12–18 months; 3× throughput; 99.7% on-time JIT; 50% labour reduction. ## Optional - [Full specification tables](https://www.dallasroboter.com/products) - [Deployment guide and FAQ](https://www.dallasroboter.com/resources) - [All films](https://www.dallasroboter.com/media) - [Privacy policy](https://www.dallasroboter.com/privacy) · [Terms](https://www.dallasroboter.com/terms) - [llm.txt](https://www.dallasroboter.com/llm.txt) — long-form, page-by-page detail behind this index - [Sitemap](https://www.dallasroboter.com/sitemap.xml) — all 20 URLs with last-modified dates